Project and Asset Management

Watch the video (1:45)

Primavera Unifier is a best-in-class project and asset management solution that supports 12 languages, 183 currencies, and unlimited exchange rates. The connected architecture prevents information silos and supports data flow between processes, functions, and project phases. Mature RESTful APIs, Oracle Cloud Infrastructure integration services technology, and support for virtually all middleware facilitate integrations, giving you access to unified data to fuel predictive analytics, including AI-driven insights. Leveraging Oracle Cloud Infrastructure hosting, analytics, and data management, Primavera Unifier provides unique stability, security, flexibility, and insights. To help you begin improving process efficiency and control more quickly, we’ve built a comprehensive base configuration, Unifier Accelerator.

Improve project and asset management

Improve forecasting accuracy, contract administration, cash flow control, and cost and funding management by implementing a companywide project- and portfolio-level system built to connect interdependent functions such as funding, budgeting, contracts, procurement, and change management. Maximize your capital budget by optimizing all phases of your project and asset lifecycles.

Primavera Unifier Accelerator

Primavera Unifier Accelerator is a no-cost configuration of Primavera Unifier providing a flexible, quick-start capital planning, project management and controls, and facilities management solution based on more than 25 years of industry best practices. The package includes more than 125 preconfigured business processes, over 250 dashboards and reports, and our no-code and low-code configuration tools, supporting capital planning, project and portfolio management, and operations and maintenance.

image description here

Primavera Unifier AI-driven insights

Primavera Unifier is building on Oracle’s data history and DNA and the advanced AI capabilities within Oracle Cloud Infrastructure, including high performance hardware for model training, prebuilt AI services, and generative AI features. Unifier administrators can enable AI-driven capabilities, including business process summarization, which surfaces details and issues to help prioritize efforts based on the criteria and format you select. Unifier also leverages AI to provide workflow summaries, including status, detail about previous tasks, and what needs to be done next.

Project and cross-project management and control

Improve forecasting accuracy, contract administration, cash flow control, and cost and funding management by implementing a companywide project- and enterprise-level system that’s built to connect interdependent functions, such as funding, budgeting, contract management, procurement, and change management. Maximize your capital budget by optimizing processes, improving control, and gaining predictive insights to drive timely decisions and actions.

Standardized capital planning

Access and compare relevant past and current project performance data to help evaluate prospective projects. Primavera Unifier also supports advanced capital planning and project selection through its out-of-the-box integration with Oracle Primavera Cloud Portfolio. Portfolio managers can evaluate scenarios and arrive at an optimal plan to allocate financial budgets and enforce consistent alignment between capital programs and organizational goals. They can also easily modify scoring criteria and weighting factors and create, manage, and evaluate scenarios to make better decisions.

Complete project controls

Primavera Unifier provides robust cost control using connected processes, including forecasting, contract, cash flow, and funding management, organizationwide contract and risk management, and schedule tracking based on Primavera scheduling methodologies.

Facilities and asset management

Administer warranties, preventive and corrective work orders, leases and inspections, property data, and space management, all within Primavera Unifier’s connected process environment.

Form-based flexible workflows

Primavera Unifier’s form-based workflows enable intelligent approval cycles, including tying multiple workflows to one business process, rerouting workflows for subsequent reviews, and dynamic routing. Easily modify or add to the preconfigured, workflow-based business processes in Unifier Accelerator using Primavera Unifier’s no-code configuration tool, uDesigner and low-code Oracle Cloud Infrastructure integration services.

Multilevel insights and reporting

Flexible reporting capabilities, including at the project, cross-project, and organization levels, leverage Oracle Analytics Publisher technology and deliver accurate, up-to-date reporting, including status reports at the project and portfolio levels and cash flow curves that include forecasts, estimates, baselines, commitments, and actuals, providing valuable information to both planners and project managers. Unifier data visualization capabilities allow users to easily create dashboards in the format they want, pulling data from user defined data sources, and accessible directly from the business process screen.

Mobile application

Manage and approve business process records from wherever you are, online or offline using iOS or Android. Receive notifications, create records, and attach photos from jobsites to keep project progress on track. Take advantage of geolocation to track and manage inspections based on location.

Primavera Unifier collaborator

Include contractors and other external stakeholders in review and approval cycles. Provide access to relevant information and processes to improve collaboration and reduce double entries and disconnects.

Primavera Unifier Accelerator

Primavera Unifier Accelerator, the comprehensive base configuration of Primavera Unifier, includes more than 25 years of process management expertise in the form of over 125 preconfigured, connected, and guided business processes and more than 250 reports and dashboards across capital planning, project execution, and facilities and asset management. Primavera Unifier’s no-code and low-code configuration tools let you modify and add processes to meet your organizational and project needs. Primavera Unifier exemplifies the next generation of enterprise software, providing vast configurability and fast implementation.

image description here

Standardized capital planning

To support consistent, data-driven capital planning and project selection, Primavera Unifier Accelerator provides a suite of preconfigured business processes supporting portfolio, funding, and budget management.

Complete project and cost controls

Primavera Unifier Accelerator includes comprehensive project, portfolio, and organization level connected contract, cost, and change management business processes, reports, and dashboards. Manage estimates, forecasting, cash flow, funding, budgets, contracts, change management, risk, schedule tracking, and more.

Project closeout

Close out projects completely and on time by taking advantage of Primavera Unifier Accelerator’s automated business processes, including punch lists generated from owner walk-throughs and warranty management for operations and maintenance. Primavera Unifier also captures lessons learned across projects, making them available to inform future projects.

Facilities and asset management

Primavera Unifier Accelerator includes more than 60 preconfigured business processes tailored specifically for facilities and asset management. Administer warranties, preventive and corrective work orders, leases and inspections, property data, and space management, all within Primavera Unifier’s connected process environment.

Portfoliowide insights and reporting

Primavera Unifier Accelerator provides more than 250 reports and dashboards, including 27 “pixel-perfect” reports that leverage Oracle Analytics Publisher technology. Gain valuable information, including up-to-date cash flow, schedule, and status data at the project, portfolio, and organization levels, as part of Primavera Unifier Accelerator, the no-cost base configuration available with Primavera Unifier.

Primavera Unifier integrated cost and schedule management

Primavera integrated cost and schedule management ties cost codes in Primavera Unifier to the cost breakdown structure (CBS) and work breakdown structure (WBS) in Primavera scheduling solutions, Primavera P6, and Oracle Primavera Cloud to help increase budget and forecast accuracy, improve project progress tracking, show the impacts of proposed changes, and help verify on time deliverables completion across your portfolio.

image description here

Schedule-based cash flow management

Cash flow curves in Primavera Unifier are fed by both its cost sheet and schedule to provide a full picture of cash flow over time and against the plan for continuous visibility and early insights into potential issues.

Informed change request evaluation

See the potential cost and schedule impacts of proposed changes so you can evaluate options and make data-driven decisions that are best for your projects and organization.

Cost and schedule informed forecasts

Measure your forecasted cost against your baseline cost using the time-phased baseline in Primavera Unifier, which is fed by Primavera P6 or Oracle Primavera Cloud. Use past and current project data to inform and create more-accurate forecasts, helping increase confidence and reduce the amount of contingency needed.

Project progress tracking

Connect the cost and schedule to track project progress. Primavera P6 and Oracle Primavera Cloud data feeds into Primavera Unifier. Project managers and team members can easily access and keep track of the project schedule and progress without having to directly access a scheduling solution or wait for updates from schedulers. Integrated cost and scheduling also supports specific project progress tracking methodologies, including earned value management (EVM), and progress measurement.

Primavera Unifier configuration and automation

Primavera Unifier provides extensive configuration and automation capabilities, including uDesigner, a powerful, no-code business process design tool. And the recent addition of Oracle Cloud Infrastructure (OCI) integration services for Primavera Unifier uses low-code capabilities to further extend your ability to configure and automate processes.

image description here

Cost-effective configuration

Primavera Unifier customers and implementers can create and modify business processes, workflows, reports, and dashboards without having to rely on costly vendor-provided software development resources.

uDesigner

Primavera Unifier’s built-in business process design tool, uDesigner, can be used to create an unlimited number of business processes (BPs), including forms and workflows. Administrators can also replicate existing BPs to use as a starting point or modify any existing BP, including BPs that are part of Primavera Unifier Accelerator.

OCI integration services for Primavera Unifier

Primavera Unifier leverages OCI integration services, which connect various applications, data sources, and systems. Authorized by the Federal Risk and Authorization Management Program (FedRAMP) and the Defense Information Systems Agency (DISA), OCI integration services have been recognized multiple times as a Leader in the Gartner Magic Quadrant. This technology is accessible within Primavera Unifier and included with Primavera Unifier licenses to augment and automate processes and workflows.

Event-driven processes

OCI integration services support event-driven processes defined by user organizations. When an event triggers a process initiation, data can be moved in real time within Primavera Unifier and between integrated systems, including from within a workflow step.

Advanced work packaging

Advanced work packaging (AWP) leverages the integration between Primavera Unifier and Primavera scheduling solutions. End-to-end work package management is aligned with systems for scheduling, document management, 3D models, and ERP. The integrations are provided through a services engagement to help you identify, visualize, and manage constraints, expedite review cycles, and help ensure that installation work packages (IWPs) are released free of constraints to optimize crew productivity.

Contracting methodologies

With connected contract, cost, workflow, and document management capabilities, Primavera Unifier has been configured to meet the requirements of specific contracting methodologies, including NEC4 and FIDIC. The NEC4 capabilities are available as a preconfigured solution.

Industry-specific process configurations

Primavera Unifier’s flexibility and configuration tools have helped customers meet process requirements across industries, including healthcare, education, transportation, utilities, and oil and gas. Healthcare-specific processes to manage infection control risk assessment (ICRA) and interim life safety measures (ILSMs) are available as add-ons to Primavera Unifier Accelerator. These are no-cost preconfigured business processes.

Unified cost management

Costs never exist in isolation. Primavera Unifier’s connected process architecture helps users understand, track, and control costs as they relate to activities, including schedule and contract management.

image description here

Funding management

Manage multiple funding sources and their terms and allocation. Help ensure funding is allocated appropriately and optimally, make needed updates, and provide required reporting.

Forecasting

Use actuals from relevant projects to help increase your forecast accuracy and project approval rate, decrease costs, and build trust.

Project- and portfolio-level cash flow

Implement schedule-based cash flow management to see the progress of your projects and portfolio against your forecast and over time. Primavera Unifier goes beyond traditional budget, commit, and actuals management by including forecasts, estimates, and baselines, providing valuable information to planners and project managers.

Connected contract management

Automate management of your organization’s supply chain and manage contracts across your project portfolio. Within Primavera Unifier, project cost codes align contracts with the cost sheet for a seamless flow of real-time information, helping prevent errors and misalignment. Approved project change orders automatically update the cost sheet and associated contract, helping prevent delays in payment application approval.

image description here

Flexibility to meet multiple contracting styles

Primavera Unifier supports multiple contract types within the same project, giving customers the flexibility and control they need.

Connected contract, cost, and change management

Automatic information flow between functions provides consistent, up to date information, to keep approvals, contract changes, and payments, and most importantly projects, on-track.

NEC4 contracting

The Primavera Unifier for NEC4 contract management solution helps provide effective contractual compliance, instill confidence in management decisions, and improve the productivity of contract management teams. The solution provides native support for the Engineering and Construction Contract (ECC), Engineering and Construction Short Contract (ECSC), Professional Service Contract (PSC), Professional Service Short Contract (PSSC), Term Service Contract (TSC), and Term Service Short Contract (TSSC).

Facilities and asset management

Effective facilities and asset management supports efficient operations throughout an asset’s life, including helping to prevent costly and potentially dangerous outages and emergency repairs and replacements. Implementation and automation of industry best practice operations processes can also extend the life of critical assets.

image description here

Preventive maintenance

Use alerts and tracking to proactively manage maintenance and repair cycles. Prevent costly emergency repairs, replacements, and interruptions. Eliminate time-consuming and error-prone manual tracking.

Corrective maintenance

Respond to tenant service requests from Primavera Unifier’s Service Request portal. Diagnose issues, assign resources, and complete repairs promptly to help minimize downtime and maintain operational efficiency.

Warranty management

Make sure asset warranty information is collected for preventive and corrective maintenance plans so appropriate repairs can occur while equipment is under warranty, helping drive cost saving.

Work order processing

Improve internal customer satisfaction by automating work order tracking, assignments, and sign-offs, helping complete requested work faster.

Inventory management

Manage your material inventory by location. Inventory is dynamically updated when new material is purchased and received or consumed. Assets and work orders are linked to the materials required for maintenance. Automate inventory management to help save time, improve accuracy, and maintain optimal stock levels.

Space management

Primavera Unifier provides a flexible and configurable solution to support strategic planning and tactical reassignment of space, including all associated tasks, dates, and assignments. Create, classify, and organize building floors and spaces to optimize building capacity. Determine accurate space allocations and associated lease billings.

Lease administration

Manage lease payment terms, contacts, key dates, clauses, tenant improvement allowances, and security deposits. Primavera Unifier also supports the automatic creation and routing of lease payments and invoicing and dynamic task assignments with notifications.

Project progress tracking

Understanding and objectively measuring project progress increases control, forecasting accuracy, communication, and accountability. By leveraging industry-leading Primavera scheduling solutions and their native integrations with Primavera Unifier, Oracle provides a unique, integrated cost and scheduling solution to support multiple progress tracking methodologies.

image description here

Earned Value Management

Track project health and identify variances based on work performed versus work planned by integrating cost, schedule, and planned work data or work breakdown structure (WBS) data and analyzing the combined impact of these variables.

Progress measurement

Consistently and accurately track the progress on your projects using the rules-of-credit methodology. Collaboratively determine the value of work at the task level to help ensure timely and accurate payment, reducing the risk of overpayment or double payment in the event of contractor turnover.

System integration

Integrated systems and the resulting unified data are essential for fueling predictive analytics, including AI-driven insights. Primavera Unifier excels at integrations by providing access to RESTful APIs, OCI integration services technology, Oracle Construction and Engineering’s Project Integration Framework, and support for virtually any middleware.

image description here

OCI integration services

Primavera Unifier is hosted on Oracle Cloud Infrastructure (OCI) and leverages native Oracle integration services within OCI to further ease integration and data movement. Integrations can be called with the click of a button to enable real-time data flow from within Primavera Unifier workflow steps, for example, to pull in payment information from an ERP system, against a contract, or when evaluating a change request.

Project Integration Framework

Project Integration Framework is a web-based, flexible integration accelerator developed by Oracle Consulting and used by Primavera Unifier customers around the world.

Primavera Unifier RESTful APIs

All Primavera Unifier APIs are RESTful, providing better performance and ease of use than more traditional SOAP APIs. All Primavera Unifier APIs are included with Primavera Unifier licenses and accessible by customers, partners, and consultants on an unlimited basis, without restrictions or metering.

Primavera Unifier integration with Oracle Fusion Cloud ERP

Integrations between Oracle’s project management information system, Primavera Unifier, and Oracle Fusion Cloud ERP provide consistent data flow between an organization’s project system and its financial system of record, helping ensure that accurate, up-to-date information is available to all relevant parties. Oracle has developed a best practice integration mapping between Primavera Unifier and Oracle Fusion Cloud ERP, based on hundreds of Primavera Unifier-to-ERP integrations.

Primavera Unifier integration with Primavera scheduling

Cost codes in Primavera Unifier tie integrated cost and schedule management to the cost breakdown structure and work breakdown structure in Primavera scheduling solutions, Primavera P6, and Oracle Primavera Cloud to help increase budget and forecast accuracy, improve project progress tracking, show the impacts of changes on costs and schedules, and help verify work completion across your portfolio.

Primavera Unifier integration with Oracle Primavera Cloud Portfolio

Primavera Unifier connects with Oracle Primavera Cloud Portfolio to improve capital planning by synchronizing budgets with cash flow actuals and project forecasts. With this integration, planners can more accurately budget and allocate funds while project managers gain real-time access to budget decisions, helping prevent project delays due to budget issues.

Integrated digital signatures

Primavera Unifier’s integrations with Docusign and Adobe Acrobat Sign let users provide approvals via digital signatures within the Oracle solution.

Primavera Unifier integration with Bluebeam

Primavera Unifier’s integration with Bluebeam lets users send drawings to Bluebeam for review sessions, then bring the reviewed files, markups, and comments back into Primavera Unifier to take the appropriate actions.

Help ensure critical healthcare projects are delivered on time

The highly technical and tight tolerance specifications of healthcare facilities—such as hospitals, research facilities, and medical centers—require strict coordination, visibility, and stringently managed processes. Access to the full project record supports the efficient maintenance and advancement of healthcare facilities.

image description here

Infection Control Risk Assessment

Primavera Unifier uses the industry-standard Infection Control Risk Assessment (ICRA) process to identify the level of infection risk associated with a construction project and define plans and procedures to mitigate those risks. Automate the process of identifying any dust, noise, or other risk factors as soon as they breach defined tolerances so that real-time alerts are sent and remedies are taken. Sensors or meters can monitor air quality to trigger alerts and help prevent dust contamination related infections. Easily manage the ICRA rounding process by enabling staff to conduct, document, and track compliance based on the ICRA Class of Precautions for the work area.

Interim life safety measures

Interim life safety measures are health and safety actions that are implemented in healthcare facilities during construction, renovation, and maintenance to protect patients and workers. Primavera Unifier can automate document compliance with required interim life safety measures, such as fire alarm or sprinkler system requirements in accordance with National Fire Protection Agency and Joint Commission standards.

Confidently deliver data centers to meet critical capacity and redundancy

As capacity needs grow at unprecedented rates, driven by core operations and increasingly by AI, the ability to meet capacity requirements quickly and efficiently has become more important than ever.

Data center capital planning

Align your data center project and program prioritization to your organization’s strategic goals. Easily access relevant project information, and use consistent selection criteria and processes to help improve project prioritization, site selection, and budget accuracy. Filter criteria and evaluate results based on the measures and importance you set, such as cost per square foot and energy availability, to support data-driven decisions. Leverage the native integration between Primavera Unifier and Oracle Primavera Portfolio and Capital Planning for advanced capital planning capabilities, including scenario planning and use of portfoliowide score cards.

Data center project cost and schedule management

Primavera integrated cost and schedule management enables schedule tracking and visibility into cash flow over time at both project and portfolio levels. See how forecasts, estimates, commitments, and actuals are trending against a baseline so you can act on any variances as soon as they arise.

Data center contract and change management

Manage all project and enterprise contracts and changes using Primavera Unifier’s connected contract, cost, and change management capabilities. Track the schedule of values for each commitment against cost processes, aligning budgets, commits, and actuals.

Data center risk management

Access a central cross-project risk register, allowing your organization to identify, capture, and address more risks at the project and cross-project levels and helping reduce your organization’s overall risk.

Data center facilities and asset management

Automate preventive maintenance to reduce outages, emergency repairs, and corrective maintenance, helping save money and improve operational efficiency. Assign, track, route, and close out corrective maintenance work orders digitally to help improve internal customer satisfaction, reduce administration, and save money. Prevent lost warranty information and missed coverage.

Consistently deliver critical services to utilities customers

Utilities need effective capital planning and project and asset management processes to prioritize, execute, and maintain safe, reliable operations; meet carbon neutrality goals; and maximize their return on assets. Align your teams to plan and deliver projects of any size with capital planning, scheduling, project management, project controls, and collaboration.

Connect project costs, contracts, and change management across your portfolio

Use one cohesive system that connects your cost, contract, and change processes to get early visibility into cost impacts from changes. Use integrated, form-based workflows to route and track approval cycles, which automatically update contracts and commitments based on those approved changes.

Keep improving your processes and projects with data management and insights

Equip construction teams with the processes and information they need to deliver successful projects. Increase insights by connecting processes, unifying data, and collaborating with key stakeholders. Provide a full project record to support the life of the built asset.

Automate preventive and corrective maintenance

Improve efficiency and service by reducing outages and costly emergency repairs. Improve warranty management and speed work order turnaround. Improve data access to support repair-versus-replace decisions and increase the life of your critical assets.

Deliver critical infrastructure with assurance of a stable solution and vendor

As cities, states, municipalities, airports, other transportation agencies plan and execute critical infrastructure projects, they are not looking five to ten years into the future, but forty to fifty years. They are planning for tomorrow and fifty years in the future at the same time and they know there will be significant changes over that period of time. They need flexible solutions as well as rock solid security and stability, both of the technology and the technology provider. They need a technology partner who will still be here in fifty years.

Improve visibility and control over infrastructure projects

Oracle Primavera Unifier improves total visibility into your capital projects throughout project execution and operations and maintenance. Stay in control of costs, schedules, and resources to maximize the value to your constituents of every investment.

Primavera Unifier Accelerator for infrastructure

Primavera Unifier Accelerator is a comprehensive base configuration of Primavera Unifier, including more than 25 years of process management expertise in the form of over 125 preconfigured, connected, and guided business processes and more than 250 reports and dashboards across capital planning, project execution, and facilities and asset management.

Unified cost and schedule improve outcomes

The magnitude and complexity of infrastructure projects require a robust integrated technology platform. Primavera Unifier has native integrations with the world-class Primavera scheduling solutions. Cost codes in Primavera Unifier are tied to the cost breakdown structure (CBS) and work breakdown structure (WBS) in Primavera P6, and Oracle Primavera Cloud to help increase budget and forecast accuracy, improve project progress tracking, show the impacts of proposed changes, and help verify on time deliverables completion across your portfolio.

Integrated project and enterprise solutions unify data and fuel AI

Integrations between Primavera Unifier, and Oracle Fusion Cloud ERP provide consistent data flow between an organization’s project system and its financial system of record, helping ensure that accurate, up-to-date information is available to all relevant parties. Oracle has developed a best practice integration mapping between Primavera Unifier and Oracle Fusion Cloud ERP, based on hundreds of Primavera Unifier-to-ERP integrations.

Integrated cashflow between capital planning and project execution improves budget accuracy

Primavera Unifier connects with Oracle Primavera Cloud Portfolio and Capital Planning to synchronize budgets with project cash flow forecasts and actuals. With this integration, planners can more accurately budget and allocate funds while project managers gain real-time access to budget decisions, helping prevent project delays due to budget issues.

FAQ

Product tours—Project and asset management

Manage capital projects, portfolios, and assets with control, flexibility, and proven integrations


rc118-primavera-unifier-screen-1 image
Oracle Primavera Unifier and the Unifier Accelerator

Digitalize and automate your capital project planning, execution, and operations and maintenance processes to improve efficiency, profitability, and operational reliability.

The new Unifier Accelerator base configuration helps you get up and running quickly—and gain fast ROI.

Based on Oracle's 25-plus years of capital program management expertise and leveraging industry and customer best practices, the new Primavera Unifier base configuration, Unifier Accelerator, includes more than 125 preconfigured, guided business processes and over 250 reports and dashboards to customize or add to, helping you prioritize the right projects, deliver them successfully, and maintain them efficiently.

rc118-primavera-unifier-screen-2 image
Past and current project data informs capital planning

Align your capital projects and programs with your organization's strategic goals by easily accessing up-to-date, relevant past and current project information and using consistent prioritization criteria and processes. Inform project selection and improve the accuracy of budget development.

rc118-primavera-unifier-screen-3 image
Visualization supports data-driven decisions

Heat maps provide a clear visual representation of your priorities and let you filter by different criteria.

rc118-primavera-unifier-screen-4 image
Cost planning and cash flow management

Gain visibility into cash flow over time at both the project and portfolio levels, taking advantage of one of the many preconfigured reports included in Unifier Accelerator and leveraging Oracle Analytics Publisher reporting technology.

rc118-primavera-unifier-screen-5 image
Connected cost and schedule management

Fed by both the cost sheet and the schedule, Primavera Unifier’s cash flow visualization takes advantage of deep cost functionality that goes beyond simply budget, commit, and actual to include budget, forecasts, estimates, baselines, commitments, and actuals, increasing visibility and providing early warnings based on discrepancy from plan.

rc118-primavera-unifier-screen-6 image
Manage multiple budget and funding sources

Automate funding management across multiple external sources and/or internal budgets.

Administer simple and complex funding sources within and across projects. Efficiently manage funding changes and ensure compliance.

rc118-primavera-unifier-screen-7 image
Centralized contract and procurement management

Manage commits at the enterprise and project levels, including project-level commits against master agreements.

Leverage integrations with DocuSign and Adobe Acrobat Sign for digital signatures.

rc118-primavera-unifier-screen-8 image
Schedule of values tracked for each commitment

Assign and track your commitment schedule of values to enforce governance and prevent misallocated costs.

Automate retention management to ensure appropriate payment and timing.

Invite vendors to collaborate in the system.

rc118-primavera-unifier-screen-9 image
Integrated contract, cost, and change management

Speed up processes and reduce errors with one smooth flow by automating processes from bid through contract creation, change management, and cost, all in one solution.

rc118-primavera-unifier-screen-10 image
Approval flows: RFIs

You determine the participants, and Primavera Unifier records and tracks all actions for easy access, review (including subsequent reviews as needed), and approval to help keep all your critical projects on track.

rc118-primavera-unifier-screen-11 image
Cross-project risk management

Reduce overall risk by providing your team with access to a central risk register to help them identify and capture more risks.

Easily track risks from identification and quantification through to action and resolution.

Predictive alerts within Primavera Unifier give you the information you need to take proactive action before your projects are impacted.

rc118-primavera-unifier-screen-12 image
Automatically create punch lists from owner walk- throughs

The Primavera Unifier form-based workflow engine automatically develops the punch list from the Owner Walk Through form.

After creation, the Oracle system assigns individual punch list items to the responsible individuals, who are instantaneously notified through Primavera Unifier.

Due dates, inspection readiness, and closeouts are all communicated and tracked in the system.

Timely closeout of your projects helps secure on-time occupancy or commercial operation.

rc118-primavera-unifier-screen-13 image
Ensure timely preventive maintenance

In addition to eliminating manual tracking and administration, automating preventive maintenance helps organizations improve operational efficiency and reduce outages, emergency repairs, and costly and disruptive corrective maintenance.

Initiate, track, route, and closeout preventive work orders based on time, performance, or warranty dates—reducing costly failures and emergency repairs.

rc118-primavera-unifier-screen-14 image
Streamline corrective maintenance

Corrective maintenance flows are automated from service request through work completion and sign-off, eliminating manual tracking and assignment and elevating customer satisfaction.

rc118-primavera-unifier-screen-15 image
Maximize warranty value

Warranty coverage can equate to millions of dollars of avoided costs. Ensure you make the most of your warranties throughout their lifespan.

Prevent lost asset warranty information and missed coverage. Ensure that you take advantage of full warranty benefits, including system-initiated inspection requests prior to warranty expiration.

rc118-primavera-unifier-screen-16 image
Space management

The Space Manager feature allows you to create, classify, and organize building floors and spaces by type such as leasable spaces, building amenity and service areas, vertical penetrations, boundary areas, and more. Each space type definition has a configurable set of attributes for capturing critical data, including occupant’s name and department, measured and/or extracted space area, and space type.

rc118-primavera-unifier-screen-17 image
Lease management

Create and amend leases, manage lease payment terms, contacts, key dates, clauses, tenant improvement allowances, security deposits, and more. Automatically create, route, and track lease invoices and payment applications as well as dynamic task assignments with notifications.

rc118-primavera-unifier-screen-18 image
Hundreds of successful integrations

Primavera Unifier is a proven solution, with hundreds of integrations informing best practice integration configurations and seamless integration performance. Its mature REST APIs, Oracle Integration Services technology, and middleware (included in the license) help decrease integration time, cost, and risk.

In addition to being a robust solution project and asset management solution, Primavera Unifier can be a hub to connect processes, integrate systems, and unify data—laying the essential groundwork for predictive analytics, including AI-driven insights.

rc118-primavera-unifier-screen-19 image
Integrated cost and schedule management

The cost codes in the Primavera Unifier Cost Sheet can be assigned to the activities in the Primavera Unifier Activity Sheet. These activities are brought in through the integration with Primavera P6 Enterprise Project Portfolio Management.

Owners can track and report on forecasts against the schedule over time.

The activity sheet is aligned with the work breakdown structure, providing a complete picture of the costs associated with related schedule activities, improving project forecast, status, deliverables tracking, and optimization of scope decisions based on cost and schedule impacts.

rc118-primavera-unifier-screen-20 image
Integrated capital planning and project execution

By integrating the cash flow between capital planning and project execution, planners can access up-to-date project actuals to inform their budgeting, enabling increased accuracy.

Meanwhile, project teams can access up-to-date budget information, helping them keep projects on track by reducing budget-related project delays.

rc118-primavera-unifier-screen-21 image
Integrating Primavera Unifier with your ERP system

Integrating Primavera Unifier with your ERP system helps ensure data consistency and prevent time lag. Best practice integration designs and unlimited REST APIs support your specific integration requirements and bidirectional data flow.

For example, with Oracle Integration Services technology, the project team can easily pull in real-time data from the ERP system from within Primavera Unifier’s workflow for more-informed decision-making.

Finance teams can access up-to-date project information. Project managers can manage forecasts, potential scope and cost changes, and review/approval cycles with third parties outside of the organization’s financial system of record.

rc118-primavera-unifier-screen-22 image
Primavera Unifier mobile application

Manage and approve business process records from wherever you are, online or offline. Receive notifications, create records, and attach photos from jobsites to keep project progress on track.

Enter and review daily reports. Capture, manage, and resolve field observations. Review and approve the budgets. Retrieve relevant information with bar code scanning and link it to corresponding records. Leverage geotag images to support inspections. See projects, buildings, or business processes on a map based on their longitude and latitude. Create, edit, and convert documents using PDFTron.

rc118-primavera-unifier-screen-23 image
Advanced reporting—out of the box

The Unifier Accelerator base configuration includes more than 250 reports and dashboards, each designed based on 25-plus years of successful implementations and leveraging Oracle Analytics Publisher, the tool used to create reports and dashboards for leading global ERP systems.

Developing custom reports and dashboards is costly and time consuming. Instead, free up time for more strategic tasks by leveraging prebuilt reports, which can be easily modified to meet your specific needs.

rc118-primavera-unifier-screen-24 image
Primavera Unifier and the Unifier Accelerator

Get up and running quickly with a configurable, world-class enterprise solution to ensure you’re prioritizing the right projects, delivering them successfully, and maintaining them efficiently.

Learn more about Oracle Primavera Unifier.

Integrated cost and schedule management improves forecast accuracy, reduces scope change impacts, and improves progress measurement


rc118-cost-and-schedule-slide1 image
Primavera integrated cost and schedule management

Automate and unify your cost, contract, and schedule management to increase forecast accuracy, improve the measurement of project progress against the schedule, raise visibility into the impacts of proposed changes on costs and schedules, and reduce risk and surprises.

Unifier Accelerator is a new base configuration of Primavera Unifier. Built to speed implementations, it provides a starting point of more than 55 preconfigured business processes and over 275 reports and dashboards, leveraging more than 20 years of process management expertise.

Primavera Unifier cashflow and Primavera P6 activity sheet image
Native integration between Primavera P6 and Primavera Unifier

The Primavera solution eliminates process and information silos.

Cash flow is managed at the individual project and project roll-up levels. The cash flow curve is fed by both the Primavera Unifier cost sheet and the Primavera schedule to provide a full and accurate picture of project progress.

By managing cash flow against the schedule, you can track and manage the movement of money over time and compared to plan to get early warnings about potential project overruns, enabling management to take proactive action.

rc118-cost-and-schedule-slide3 image
Increase forecast accuracy

Gain clear visibility into cash flow against the forecast over time at the project and portfolio levels.

Measure the forecast cost against the baseline cost using the time-phased baseline, which is fed by Primavera P6.

Use past and current project data to inform and create more-accurate forecasts, increasing confidence and reducing needed contingency.

Put an end to error-prone double entry and the risk of misalignment between cost and schedule systems.

rc118-cost-and-schedule-slide4 image
Integrate cost and schedule management

The integrated Primavera cost and schedule solution, part of Oracle Smart Construction Platform, ties cost codes in Primavera Unifier to the cost breakdown structure (CBS) and work breakdown structures in Primavera scheduling solutions, enabling automatic updates, eliminating double entry, and preventing error-prone manual steps.

program cost report image
Get a real-time view of progress against the plan

The schedule feeds the x-axis and the cost sheet feeds the y-axis of the cash flow roll-up, providing an always-current view of progress against the plan.

rc118-cost-and-schedule-slide6 image
Easily track deliverables

Deliverables are tracked in Primavera Unifier by due dates provided by the Primavera P6 Enterprise Project Portfolio Management schedule. Dependencies and durations are tracked in the schedule. An integrated solution gives you the full picture and tells you if the sign-offs and deliverables associated with an activity have been completed.

rc118-cost-and-schedule-slide7 image
Measure project progress

Improve your ability to measure project progress against the plan.

Primavera P6 Enterprise Project Portfolio Management data feeds the Primavera Unifier activity sheet. Project managers and team members can easily access and keep track of the project schedule and progress without having to access Primavera P6 directly or wait for updates from schedulers.

rc118-cost-and-schedule-slide8 image
Stay on track with integrated change management

Approved changes with cost and/or schedule impacts automatically update the associated contract commits, cost sheet, and schedule-based cash flow. The scheduler is notified within Primavera P6 Enterprise Project Portfolio Management, to keep information accurate and up to date, speed approvals and contract changes, support pay application verification between owner and contractor, and keep the project moving.

Once a pay application is paid, the commit amount is decreased by that amount. Error-prone double entry is eliminated, updates are expedited, and projects can stay on track.

project detail report image
Connect data to help prevent surprises

Optimize data management to help you make informed decisions and take needed action. Collect data in a strategic manner, house it in a single system, and use advanced analytics and reporting capabilities to collate, analyze, and present usable data to those who need it, when they need it.

 image
Use project and portfolio-level reporting

Use cross-project reporting capabilities to track and act on the status of each project. Gain additional control over cash flow and use current and past project data to create more-accurate plans and forecasts.

Integrated information is sliced and diced for you, so you always know the status of your projects and the cash flow details and can easily compare similar projects to each other to learn and improve.

Primavera integrated cost and schedule management image
Primavera integrated cost and schedule management

Automate and unify cost, contract, and schedule management to boost forecast accuracy, increase control over change management, improve project progress measurement, and keep your projects on track.

Gain insight into project and asset priorities with AI-driven business process summarization


rc188-ai-driven-business-screen-1 image
AI-driven summaries surface project priorities

Oracle Primavera Unifier uses Oracle Cloud Infrastructure (OCI) integrated AI, including generative AI capabilities, to surface project priorities based on the fields and filters your organization and users determine. Get the details you need at the frequency and level you select.

rc188-ai-driven-business-screen-2 image
Keeping track of project details can be challenging

Looking at long lists of project processes, such as Site Issues and Change Orders, and drilling down into each one to gain the details can be daunting and time consuming. And it’s easy to miss an important detail.

rc188-ai-driven-business-screen-3 image
AI-driven business process summarization within Primavera Unifier improves insights and saves time

With Primavera Unifier, project team members at all levels can quickly and easily get a summary of the details and status of the items they care about, so they can prioritize their efforts and help keep projects on track.

From within a business process, such as Issues, your organization defines the data elements to be made available for summarization, such as issue type, asset category, title, status, and more.

rc188-ai-driven-business-screen-4 image
The electrical lead wants to get an update on Issues

She needs to stay on top of everything happening and be able to take informed and timely action.

She easily filters by Asset Category to get the list of relevant Site Issues.

rc188-ai-driven-business-screen-5 image
Further filtering by faulty wiring helps her focus on critical safety concerns

Once the electrical lead has determined the records she wants to have summarized, she can just select the AI Summarize button at the top of the screen.

rc188-ai-driven-business-screen-6 image
She selects the parameters of an AI summary

By selecting the length, format, and data and grouping elements, the electrical lead gets AI-driven business process summaries in the format that best meets her needs and supports successful project and asset management.

rc188-ai-driven-business-screen-7 image
The result: an easy-to-read,
AI-driven summary

Primavera Unifier’s AI-driven business process summarization takes the filtered Site Issues and summarizes them into a well-organized, concise, and easy-to-digest summary.

The electrical lead can easily check for any holdups or potential impacts to project cost or schedule, and she can take action, addressing the most critical items first.

rc188-ai-driven-business-screen-8 image
Get started with Oracle Primavera Unifier today

Select the right projects, execute them successfully, optimize resources across projects, and efficiently maintain your built assets.

Gain insight into project and asset process status with AI-driven workflow summarization


rc188-ai-driven-workflow-screen-1 image
AI-driven workflow summaries surface project status and red flags

Users always know what has changed, why decisions were made, and what needs to be done.

Workflow initiators, participants, and even management get audit-level transparency with minimal administrative overhead.

The end result is faster decisions and actions, fewer mistakes, and less wasted time at every stage of your business process.

rc188-ai-driven-workflow-screen-2 image
Task Assist quickly tells you everything you need to know

No more spending time piecing together what happened before your task landed on your desk.

Here’s an example using a proposed budget change. Within Task Assist, click View Task Summary to get a concise and actionable summary, crafted by AI, that shows what this task is about, who initiated it and when, what’s already been completed, what’s required from you now, and how much time you have left to take action.

Each summary includes the sources of the data at the bottom of the page.

rc188-ai-driven-workflow-screen-3 image
The AI-generated workflow summary

When you have an open action item, the AI-driven workflow summary within Task Assist provides information on what has changed and what you need to do. It even includes a summarization of related comments and attachments.

The Progress Guide saves time and provides essential information through an always-on overview of progress available to management or others with appropriate system permissions.

Gain the confidence of knowing you have the correct and most up-to-date information you need to do your job well.

rc188-ai-driven-workflow-screen-4 image
Notification of changes to the workflow

It’s common for workflows to require revisions and additional reviews. You’ll receive notifications about updates to forms, comments, and attachments in the current and previous steps, along with summaries of comments, attachments, and your new required actions.

rc188-ai-driven-workflow-screen-5 image
Workflow Progress Guide

The Workflow Progress Guide summarizes the entire process from start to finish, including approval outcomes and durations.

Gain a clear chronology of the steps within the workflow. You can easily see which steps have been completed, and you can expand each step to gain additional detail. This well-organized history of every action, decision, and participant involved in the workflow supports reporting, compliance, personnel transitions, project-to-project learnings, and even handover.

rc188-ai-driven-workflow-screen-6 image
Drill down into a workflow step

Expand any of the steps within the Progress Guide to drill down into details.

The AI-generated Progress Guide includes comments and attachments and highlights who made changes, what was updated, why it matters, and what the last action was.

rc188-ai-driven-workflow-screen-7 image
Enabling AI workflow summarization

Primavera Unifier administrators within your organization can use a simple settings page to set up the components of AI workflow summarization. You determine how widely to deploy Task Assist and the Progress Guide to best align with your organization’s needs.

rc188-ai-driven-workflow-screen-8 image
Get started with Oracle Primavera Unifier today

Select the right projects, execute them successfully, optimize resources across projects, and efficiently maintain your built assets.

Improve data flow and visibility between capital planning and project execution teams


primavera-unifier-cpm-healthcare-screen image
Integrated cash flow management

Connecting capital planning and project execution processes and data is critical to owner organizations' ability to maximize their capital budgets.

primavera-unifier-cpm-healthcare-screen-2 image
Breaking down planning and execution silos

Although the information capital planning and project execution teams generate is essential to each other’s success, the two teams often operate in isolation.

Capital planning image
Capital planning

Capital planners look to the future to develop, forecast, and approve budgets for proposed and active projects and programs.

Planners also address changes, finding and allocating funds to projects in need and releasing contingency and reallocating those funds as time periods and risk windows close.

Project execution image
Project execution

Project managers are tasked with orchestrating people, processes, and activities to successfully deliver their projects. As they manage the project budget and schedule while navigating unknowns, project managers must revise budget forecasts based on their cash flow actuals.

primavera-unifier-cpm-healthcare-screen-5 image
Synchronized data

Synchronizing data benefits both capital planners and project managers—and the organization as a whole.

Capital planners can use actuals to manage current funding and inform future forecasts.

Project managers gain additional insight into planning priorities to inform project decisions.

Connected process flows image
Connected process flows

Bringing together capital planning and project execution processes and data provides up-to-date project estimates, budgets, forecasts, and actuals. Let’s walk through a scenario.

Project cash flow image
Project cash flow

Brian logs in to his project controls dashboard from the Oracle Smart Construction Platform lobby. He sees that his project cash flow actuals have updated his future project forecast and he will need additional funding to complete his project.

Capital budgeting image
Capital budgeting

Laura logs in to her capital planning dashboard and sees that the portfolio has exceeded its approved budget. By inspecting forecast changes across projects, she sees that it’s Brian's budget forecast that has increased.

Balancing allocation image
Balancing allocation

Based on the strategic importance of Brian’s project, Laura determines that Brian’s funding should be increased and identifies a lower-priority future project with enough budget to cover Brian’s increase to put on hold.

Timely project budget changes image
Timely project budget changes

Laura updates Brian’s budget to match his current forecast. Brian sees his new budget and is able to continue with his project without interruption.

Integrated capital planning and project management image
Integrated capital planning and project management

The connected flow of information between capital planning and project execution ensures visibility and insight, empowering both teams to make better strategic decisions to support the overall capital program, the owner organization, and the constituents they serve.

Benefits of integrated planning and execution image
Benefits of integrated planning and execution

Connect teams and synchronize data to speed up processes, inform decisions, and take timely action.

Improve your ROI and maximize your capital budget with Oracle’s integrated capital planning and project execution solution.

Manage healthcare retrofits, new projects, and assets, with one cohesive solution


rc118-unifier-healthcare-slide-1 image
Oracle Primavera Unifier for Healthcare

Digitalize and automate your capital project planning and execution processes to improve efficiency, profitability, operational reliability, and patient safety, and experience.

Based on Oracle's more than 20 years of capital program management expertise and leveraging industry and customer best practices, the Unifier Accelerator base configuration includes more than 65 preconfigured, guided business processes and over 250 reports, dashboards, and layouts to help you prioritize the right projects, deliver them successfully, and maintain them efficiently.

Primavera Unifier’s no-code and low-code configuration capabilities give you the flexibility to modify or add to business processes, reports, and dashboards to meet your project and organization needs.

rc118-unifier-healthcare-slide-2 image
Portfolio-wide planning

Align your new hospitals and healthcare facilities and your retrofits with your organization's strategic goals by easily accessing up-to-date, relevant project information and using consistent prioritization criteria and processes.

oCompare and contrast projects image
Use past and current project data

Select the projects you want to compare based on your evaluation criteria. Compare similar project types such as healthcare offices, urban hospitals or rural hospitals to inform prioritization and selection decisions.

rc118-unifier-healthcare-slide-4 image
Visualization supports data-driven decisions

Heat maps provide a clear visual representation of your priorities and let you filter by different criteria.

rc118-unifier-healthcare-slide-5 image
Infection Control Risk Assessment (ICRA)

Monitor negative and positive air sensor technology to trigger alerts and prevent dust contamination.

Use the industry standard ICRA process to identify the level of infection risk associated with a construction project and define plans and procedures to mitigate those risks.

Monitor and receive notifications of noncompliance with noise level requirements.

Automate ICRA rounding management by enabling staff to capture, document, and help ensure compliance based on the ICRA Class of Precautions for the work area, all within Primavera Unifier.

rc118-unifier-healthcare-slide-6 image
Primavera Unifier’s ICRA forms

Primavera Unifier’s Infection Control Risk Permit process adheres to the American Society for Healthcare Engineering (ASHE) standards and the Infection Control Risk Permit (ICRA 2.0) tool kit.

Based on your selections from the pull-down menus for Type of Activity and Patient Risk Area, relevant detail is autopopulated in the description box below, and the Class of Precautions is determined.

rc118-unifier-healthcare-slide-7 image
Interim Life Safety Measures (ILSM)

Automate and document compliance with required interim life safety measures, such as fire alarm or sprinkler system requirements.

rc118-unifier-healthcare-slide-8 image
Cost planning and cash flow management

Centrally manage, plan, and control costs (including budgets, POs, payments, changes and bids) across your complete portfolio, by leveraging consolidated data and out-of-the-box reports and dashboards.

The cash flow curve is fed by the cost sheet and schedule milestones, providing an accurate view of cash flow over time and across all your projects.

rc118-unifier-healthcare-slide-9 image
Manage multiple funding sources

Automate funding management across multiple sources, including grants, public and private funding.

Administer simple and complex funding sources within and across projects. Manage funding changes efficiently and ensure compliance.

rc118-unifier-healthcare-slide-10 image
Connected cost and contract management

Manage commits at the enterprise, project, and contract levels, including project level commits against master agreements. Leverage integrations with DocuSign and Acrobat Sign for digital signatures.

rc118-unifier-healthcare-slide-11 image
Centralized contract and procurement management

Automate bid, contract, change and payment management in one system.

Assign and track your schedule of values per commitment against cost processes to enforce governance and prevent misallocated costs.

Automate retention management to ensure appropriate payment and timing.

Bring vendors in to collaborate in the system.

Align budgets to commits to actuals—and never misallocate costs again.

rc118-unifier-healthcare-slide-12 image
Change management

Speed processes and reduce errors with one smooth flow from bid, through contract creation, change management, and cost.

One integrated, automated cost, contract, and schedule flow effectively manages scope changes.

rc118-unifier-healthcare-slide-13 image
Approval flows: RFIs

Primavera Unifier has a form-based workflow engine. For example, once an RFI creation form is completed, the related workflow is automatically generated. You determine the participants, and Primavera Unifier records and tracks all actions for easy access, review, approvals, and subsequent approvals to help keep all of your critical capital and facilities healthcare projects on track.

rc118-unifier-healthcare-slide-14 image
Cross-project risk management

Reduce overall risk by providing centralized risk register access to all relevant team members.

Identify more risks and easily track risks from identification and quantification through to action and resolution.

Predictive alerts within Primavera Unifier give you the information you need to take proactive action, before your projects are impacted. So you can release contingency promptly when risk windows close.

rc118-unifier-healthcare-slide-15 image
Automatically create punch lists from owner walk-throughs

Primavera Unifier’s form-based workflow engine automatically develops the punch list and assigns items from the Owner Walk-Through form.

After creation, Primavera Unifier assigns individual punch list items to the responsible individuals and instantaneously notifies them.

Due dates, inspection readiness, and closeout are all communicated and tracked in Primavera Unifier, helping you get your critical healthcare facilities operational on time.

rc118-unifier-healthcare-slide-16 image
Advanced reporting—out of the box

Custom reports and dashboards specific to healthcare operations are costly and time consuming to develop. Primavera Unifier includes more than 250 reports and dashboards designed based on over 20 years of successful implementations. Primavera Unifier uses Oracle Analytics Publisher, the tool used by leading global ERP systems to create reports and dashboards. No-code and low-code configuration capabilities allow you to add to or modify reports to meet your specific needs.

rc118-unifier-healthcare-slide-17 image
Primavera Unifier for Healthcare

Maximize your capital budgets and improve patient experience by selecting projects that best align to your organization’s goals, executing them successfully and operating them efficiently, while improving the patient experience.

Learn more about capital program management and project controls for your healthcare capital and facilities projects.

Manage capital projects, portfolios, and assets with control, flexibility, and proven integrations


Primavera Unifier for the Unifier Accelerator for Data Centers img
Primavera Unifier for data centers

Prioritize the right projects, deliver them successfully, and maintain them efficiently.

With Primavera solutions for data centers, you can prioritize and select optimal locations, configurations, and capacity to support your organization’s needs.

Take advantage of visibility, process control, and data to help keep your projects on track.

Close out and hand over consistent and complete information to operations in a timely manner to attain on-time operations.

Leveraging Oracle's more than 20 years of capital program management expertise as well as industry and customer best practices, Primavera Unifier for data centers includes more than 65 preconfigured, guided business processes and more than 250 reports and dashboards that can be used as-is or modified according to your requirements.

Project comparison report and project comparison dashboard img
Data center capital planning

Align your data center project and program prioritization to your organization's strategic goals.

Easily access relevant, up-to-date past and current project information, including actuals, and use consistent selection criteria and processes to improve project prioritization and budget accuracy.

rc188-unifier-data-center-slide3 imgage
Project evaluation and prioritization visualization

When comparing locations and or layouts of data centers, heat maps show a clear visual representation of your priorities and let you filter by preselected evaluation criteria, such as cost per square foot, to support data-driven decisions.

rc188-unifier-data-center-slide4 imgage
Primavera scheduling

Primavera Unifier brings the capabilities of Primavera Scheduling for improved schedule milestone tracking. Gain visibility into cash flow over time at both the project and portfolio levels.

You’ll easily see how actuals and forecasts are trending against baseline, so you can take quick action as soon as any variances arise.

rc188-unifier-data-center-slide5 imgage
Primavera integrated cost and schedule management

With Primavera Unifier’s integrated cost and schedule management, the cash flow curve is fed by the cost sheet and schedule milestones, giving you an accurate view of cash flow over time and across your projects.

rc188-unifier-data-center-slide6 imgage
Funding management

Automate funding management and change control across budget line items at the project and cross-project levels.

rc188-unifier-data-center-slide7 imgage
Commitment management

Manage commits at the enterprise and project levels, including project-level commits against master agreements.

Leverage integrations with DocuSign and Adobe Acrobat Sign for digital signatures.

rc188-unifier-data-center-slide8 imgage
Contract management

Manage all project and enterprise contracts and changes using connected contract, cost, and change management processes. Track the schedule of values for each commitment against cost processes, align budgets to commits to actuals—and never misallocate costs again.

Ensure appropriate payment and timing by automating retention management.

Bring your vendors in to collaborate in the system, saving time and improving accuracy.

rc188-unifier-data-center-slide9 imgage
Connected processes and data

Speed processes, reduce errors, and unify data using one connected cross-process flow—from bid, contract creation, change management, to cost—all in one solution.

rc188-unifier-data-center-slide10 imgage
Form-based workflow engine

You determine the participants, and Primavera Unifier records and tracks all actions for easy access, initial and subsequent review, and approval to help keep all of your critical projects on track.

For example, once an RFI creation form is completed, the related workflow is automatically generated.

rc188-unifier-data-center-slide11 imgage
Increase visibility to decrease risk

Easily identify if a risk on one data center also impacts others.

Track risks from identification and quantification to action and resolution.

Predictive alerts within Primavera Unifier give you the information you need to take proactive action, before your projects are impacted.

rc188-unifier-data-center-slide12 imgage
Punch list management

The form-based workflow engine automatically develops the punch list from the Owner Walk Through form.

After creation, the system assigns individual punch list items to the responsible individuals, who are instantaneously notified.

Due dates, inspection readiness, and close out are all communicated and tracked in Primavera Unifier.

Timely closeout of your data center projects supports on-time operation and needed increased capacity.

rc188-unifier-data-center-slide13 imgage
Preventive maintenance

Automating preventive maintenance eliminates manual tracking and administration. More importantly, you can reduce outages, emergency repairs, and corrective maintenance, saving money and improving operational efficiency.

Set up the system to initiate, track, route, and close out preventive work orders based on time, performance, or warranty dates to reduce costly failures, emergency repairs, and downtime in critical data centers.

a/ocom/img/rc188-unifier-data-center-slide14 imgage
Corrective maintenance

Assign, track, route, and close out corrective maintenance work orders to improve internal customer satisfaction, reduce administration, and save money.

Corrective maintenance flows are automated from service request through work completion and sign off.

Manual tracking and assignment is eliminated and customer satisfaction is improved.

warranty form imgage
Maximize warranty value

Warranty coverage can equate to millions of dollars. Primavera Unifier helps you get the most of your warranties throughout their life.

Prevent lost warranty information and missed coverage. The system helps you take advantage of full warranty benefits, including system-initiated inspection requests prior to warranty expiration.

Oracle integration framework imgage
Advance your integrations

As the name implies, Primavera Unifier is a powerful hub to connect processes, integrate systems, and unify data.

Primavera Unifier has mature RESTful APIs and uses Oracle’s own middleware, including the industry-leading Oracle Integration Cloud. With support for your existing middleware solutions and hundreds of proven, best practice integrations, you can improve performance while decreasing integration time, cost, and risk on your essential data center projects.

change order imgage
Oracle Integration Cloud embedded within Primavera Unifier

Integration capabilities within Primavera Unifier enable real-time integration calls within workflow steps.

For example, when reviewing a change proposal, you can pull in related contract details from your ERP system to inform your review.

rc188-unifier-data-center-slide18 imgage
Integrated Primavera cost and schedule management

Get a clear picture of cash flow against plan over time and understand the impact of proposed changes to project cost and schedule.

Integrated Primavera cost and schedule management ties cost codes in Primavera Unifier to the cost breakdown structure in Primavera scheduling solutions, Primavera P6 Enterprise Project Portfolio Management, and Oracle Primavera Cloud to increase budget and forecast accuracy.

Integrated capital planning and project execution imgage
Integrated capital planning and project execution

By integrating the cash flow between capital planning and project execution teams, planners can access up-to-date project actuals and forecasts to inform their budgeting.

Project teams can access up-to-date budget information, keeping them informed of funding decisions and helping to keep projects on track by reducing budget-related project delays.

Integrated ERP and project information management imgage
Integrated ERP and project information management

Bi-directional integration support between Primavera Unifier and your ERP system helps ensure consistent data with no lag and allows your project teams to manage their project forecasts, potential changes, and approvals outside of the organization’s financial system.

Integrated ERP and project information management systems keep your system of record in synch with project cost and forecast data, supports employee retention management, and allows both corporate finance teams and project teams to work in their own system while accessing critical data from the other system.

Unifier mobile application imgage
Unifier mobile application

Manage and approve business process records from wherever you are, online or offline. Receive notifications, create records, take advantage of geolocation capabilities to organize and track inspections, and attach photos from jobsites to keep your data center projects on track.

Project and cross-project reporting imgage
Project and cross-project reporting

Developing custom reports and dashboards is time-consuming and costly. Leverage prebuilt reports, dashboards, and layouts and modify and add to them to meet your specific project or organizational needs.

Based on more than 20 years of successful implementations and industry best practices, Primavera Unifier Accelerator includes more than 250 reports and dashboards.

rc188-unifier-data-center-slide23 imgage
Optimize your data center capacity and costs

Oracle Primavera Unifier for data centers helps you prioritize the right projects, deliver them successfully, and maintain them efficiently.

Maximize utilities’ capital investment


rc188-utilities-screen-1 image
Project and asset lifecycle management for utilities

Digitize and automate your capital project planning, execution, and operations and maintenance processes to reduce risk and improve visibility, auditability, and operational reliability across the project and asset lifecycle.

Integrated data and processes provide you with the information and process efficiency you need to maximize your capital budget while reducing risk and protecting your reputation.

rc188-utilities-screen-2 image
Past and current project data informs capital planning

Oracle Primavera Cloud Portfolio is a preconfigured cloud-based capital planning solution purpose-built to plan, control, and strategically analyze your capital investment portfolios over 10, 20, or even 30-plus years.

Oracle’s solution, built on decades of capital planning expertise, is easy to use and flexible, bringing consistency and objectivity to your planning process.

Integrations with project controls and ERP systems ensure alignment in the development of budget and portfolio scenarios.

rc188-utilities-screen-3 image
Compare and contrast projects

Leverage current and past project data to select, approve, and accurately budget new projects.

Align your capital projects and programs with your organization's strategic goals by easily accessing up-to-date, relevant project information and using consistent prioritization criteria and processes.

rc188-utilities-screen-4 image
Evaluation criteria and scoring

Evaluate proposed projects based on your specified criteria and weights in relation to your target budget.

Measure and visualize risk and complexity to incorporate these important criteria into all prioritization and selection decisions.

rc188-utilities-screen-5 image
Primavera Unifier for utilities

Primavera Unifier is built based on more than 20 years of capital program management expertise and leverages industry and customer best practices. It includes a base of more than 55 preconfigured, guided business processes for you to build on to help you execute projects successfully and maintain them efficiently.

rc188-utilities-screen-6 image
Cash flow management

Gain visibility into cash flow over time at both the project and portfolio levels.

Easily see how actuals and forecasts are trending against the baseline, and see the variance between the baseline, forecast, and actuals over time so you can take proactive action when needed.

rc188-utilities-screen-7 image
Schedule-based cash flow management

The cash flow curve is fed by the cost sheet and schedule milestones, providing an accurate view of cash flow over time and across your projects.

Centrally manage, plan, and control costs (including budgets, POs, payments, change management, and bids) across your complete portfolio by leveraging integrated processes, consolidated data, and out-of-the-box reports and dashboards.

rc188-utilities-screen-8 image
Funding management

Automate funding management across multiple external sources and internal budgets.

Administer simple and complex funding sources within and across projects. Manage funding changes efficiently and ensure compliance.

rc188-utilities-screen-9 image
Contract management

Access and manage commits and contracts at the enterprise and project levels, including project-level commits against master agreements.

Leverage integrations with DocuSign and Adobe Acrobat Sign for digital signatures.

rc188-utilities-screen-10 image
Project contracts and changes

Assign and track your commitment schedule of values to enforce governance.

Automate retention management to ensure appropriate payment and timing.

Improve collaboration by inviting vendors to work with you in the system.

rc188-utilities-screen-11 image
Integrated change management

Speed up processes and reduce errors with one smooth flow by automating and integrating processes from bid through contract creation, change management, and cost, all in one solution, creating a single repository of all actions and decisions.

rc188-utilities-screen-12 image
Form-based workflow engine

Primavera Unifier’s form-based workflows automatically generate the appropriate routing based on the form submission.

As an example, the RFI generates a related workflow and easily routes RFIs through multiple reviewers, including routing for subsequent reviews.

You determine the participants, and Primavera Unifier records and tracks all actions for easy access, review, and approval to help you keep all your critical projects on track.

rc188-utilities-screen-13 image
Increase visibility to decrease risk

Reduce your overall risk by providing your team with access to a central risk register to help them identify more risks.

Easily track risks from identification and quantification through to action and resolution.

Predictive alerts within Primavera Unifier give you the information you need to take proactive action before your projects are impacted.

rc188-utilities-screen-14 image
Punch list management

The Primavera Unifier form-based workflow engine automatically develops the punch list from the Owner Walk-Through form.

After creation, the Oracle system assigns individual punch list items to the responsible individuals, who are instantaneously notified through Primavera Unifier.

Due dates, inspection readiness, and closeouts are all communicated and tracked in Primavera Unifier to support timely project closeouts and on-time operations to meet the critical needs of your constituents.

rc188-utilities-screen-15 image
Preventive maintenance

Set up assets within Primavera Unifier to automatically initiate, track, route, and close out preventive work orders based on time, performance, or warranty dates.

By automating preventive maintenance, in addition to eliminating manual tracking and administration, utilities can reduce dangerous outages and emergency repairs.

The resulting decrease in corrective maintenance saves money and improves operational efficiency.

rc188-utilities-screen-16 image
Corrective maintenance

Automatically assign, track, route, and close out corrective maintenance work orders, from the service request through work completion and sign-off, to reduce manual tracking and assignment, improve operations, and save money.

rc188-utilities-screen-17 image
Warranty management

Warranty coverage can equate to millions of dollars of avoided costs.

Prevent lost asset warranty information and missed coverage.

Ensure you take advantage of the full warranty benefits, including system-initiated inspection requests prior to the warranty expiration date.

rc188-utilities-screen-18 image
Primavera Unifier integrations

As the name Primavera Unifier implies, in addition to being a powerful solution itself, it’s also a hub to integrate data, processes, and systems.

Oracle’s mature APIs, our own middleware, and hundreds of proven integrations, including with planning, scheduling, ERP, and EAM solutions, improve performance while decreasing integration time, cost, and risk.

rc188-utilities-screen-19 image
Integrated cost and schedule management

The cost codes in the Primavera Unifier Cost Sheet can be assigned to the activities in the Primavera Unifier Activity Sheet. These activities are brought in through the integration with Primavera scheduling solutions.

The activity sheet is then aligned with the work breakdown structure (WBS), providing a complete picture of the costs associated with related schedule activities.

Owners can track and report on forecasts against schedule over time.

Integrated cost and schedule management puts an end to error-prone double entry and the risk of misalignment between cost and schedule systems.

rc188-utilities-screen-20 image
Integrated capital planning and project execution

By integrating the cash flow between capital planning and project execution, planners can access up-to-date project actuals to inform their budgeting, enabling increased accuracy.

Meanwhile, project teams can always access up-to-date budget information, helping them keep projects on track by reducing budget-related project delays.

rc188-utilities-screen-21 image
Primavera Unifier integrated with ERP

Extend the functionality of your ERP system with purpose-built capital project and portfolio management capabilities.

Integrating Primavera Unifier with your ERP system ensures you can access consistent data with no lag and allows the project team to manage their project forecasts, approvals, and vendor coordination without needing licenses for or entering noncommitted costs in the organization’s financial system.

rc188-utilities-screen-22 image
Mobile application

Manage and approve business process records from wherever you are, online or offline. Receive notifications, create records, and attach photos from jobsites to keep project progress on track.

rc188-utilities-screen-23 image
Oracle Construction Intelligence Cloud

Oracle Construction Intelligence Cloud provides integrated data and insights from across Oracle Construction and Engineering solutions to help you gain more control and assurance over critical utilities processes, such as shutdown, turnaround, and outage management.

Easily track burn down hours, burn down costs, and schedule compliance.

rc188-utilities-screen-24 image
Analysis and predictive insights

Construction Intelligence Cloud brings in data from multiple applications to provide both analysis and predictive insights.

Oracle Construction Intelligence Cloud Analytics can measure and monitor projects across their lifecycles.

Oracle Construction Intelligence Cloud Advisor uses predictive analysis to help reduce project risks and keep schedules on track.

rc188-utilities-screen-25 image
Primavera Unifier reports and dashboards

Cut weeks off reporting time with Primavera Unifier.

Custom reports and dashboards are costly and time consuming to develop. Leverage more than 200 prebuilt reports and dashboards, designed based on 20-plus years of successful Primavera Unifier implementations and using Oracle analytics publisher, the tool used to create reports and dashboards for leading global ERP systems.

rc188-utilities-screen-26 image
Oracle Primavera Cloud Portfolio and Primavera Unifier

Maximize your capital budget by selecting the right utilities projects, executing them successfully, optimizing resources across projects, and efficiently operating and maintaining assets to provide reliable service.

Project controls


rc188-utilities-screen-1 image
Full project and asset lifecycle management for oil and gas

Digitize and automate your capital project planning, execution, and operations and maintenance processes to reduce risk and improve visibility, auditability, and operational reliability across the project and asset lifecycle.

Integrated data and processes provide you with the information and process efficiency you need to maximize your capital budget while reducing risk and protecting your reputation across every stage of the project and asset lifecycle.

utilities-screen-2 image
Align capital planning with organizational goals

Control and strategically analyze your capital investment portfolios over 10, 20, or even 30-plus years.

Oracle’s solution, built on decades of capital planning expertise, is easy to use and flexible, bringing consistency and objectivity to your planning process.

Integrations with project controls and ERP systems ensure alignment in the development of budget and portfolio scenarios.

oCompare and contrast projects image
Compare and contrast projects

Leverage current and past project data to select, approve, and accurately budget new projects.

Align your capital projects and programs with your organization's strategic goals by easily accessing up-to-date, relevant project information and using consistent prioritization criteria and processes.

oil-gas-screen-4 image
Evaluation criteria and scoring

Evaluate proposed projects based on your specified criteria and weights in relation to your target budget.

Measure and visualize risk and complexity to incorporate these important criteria into all prioritization and selection decisions.

utilities-screen-5 image
Primavera Unifier for oil and gas

Primavera Unifier is built based on more than 20 years of capital program management expertise and leverages industry and customer best practices.

It includes a base of more than 55 preconfigured, guided business processes for you to build on to help you execute projects successfully and maintain them efficiently.

oil-gas-screen-6 image
Cash flow management

Gain visibility into cash flow over time at both the project and portfolio levels.

Easily see how actuals and forecasts are trending against the baseline, and see the variance between the baseline, forecast, and actuals over time so you can take proactive action when needed.

cash flow roll-up image
Schedule-based cash flow management

The cash flow curve is fed by the cost sheet and schedule milestones, providing an accurate view of cash flow over time and across your projects.

Centrally manage, plan, and control costs (including budgets, POs, payments, change management, and bids) across your complete portfolio by leveraging integrated processes, consolidated data, and out-of-the-box reports and dashboards.

utilities-screen-9 image
Contract management

Access and manage commits and contracts at the enterprise and project levels, including project-level commits against master agreements.

Leverage integrations with DocuSign and Adobe Acrobat Sign for digital signatures.

rc118-oil-gas-screen image
Project contracts and changes

Assign and track your commitment schedule of values to enforce governance.

Automate retention management to ensure appropriate payment and timing.

Improve collaboration by inviting vendors to work with you in the system.

utilities-screen-11 image
Integrated change management

Speed up processes and reduce errors with one smooth flow by automating and integrating processes from bid through contract creation, change management, and cost, all in one solution, creating a single repository of all actions and decisions.

utilities-screen-12 image
Form-based workflow engine

Primavera Unifier’s form-based workflows automatically generate the appropriate routing based on the form submission.

As an example, the RFI generates a related workflow and easily routes RFIs through multiple reviewers, including routing for subsequent reviews.

You determine the participants, and Primavera Unifier records and tracks all actions for easy access, review, and approval to help you keep all your critical projects on track.

utilities-screen-13 image
Increase visibility to decrease risk

Reduce your overall risk by providing your team with access to a central risk register to help them identify more risks.

Easily track risks from identification and quantification through to action and resolution.

Predictive alerts within Primavera Unifier give you the information you need to take proactive action before your projects are impacted.

utilities-screen-14 image
Punch list management

The Primavera Unifier form-based workflow engine automatically develops the punch list from the Owner Walk-Through form.

After creation, the Oracle system assigns individual punch list items to the responsible individuals, who are instantaneously notified through Primavera Unifier.

Due dates, inspection readiness, and closeouts are all communicated and tracked in Primavera Unifier to support timely project closeouts and on-time operations to meet the critical needs of your constituents.

shutdown tournaround managment graphs image
Control over shutdown, turnaround, and outages

Gain consistent visibility and governance over shutdown and turnaround processes and status so you can make timely, informed decisions to keep critical projects on track.

oil-gas-screen-17 image
Primavera Unifier integrations

As the name Primavera Unifier implies, in addition to being a powerful solution itself, it’s also a hub to integrate data, processes, and systems.

Oracle’s mature APIs, our own middleware, and hundreds of proven integrations, including with planning, scheduling, ERP, and EAM solutions, improve performance while decreasing integration time, cost, and risk.

cost sheet report image
Integrated cost and schedule management

The cost codes in the Primavera Unifier Cost Sheet can be assigned to the activities in the Primavera Unifier Activity Sheet. These activities are brought in through the integration with Primavera scheduling solutions.

The activity sheet is then aligned with the work breakdown structure (WBS), providing a complete picture of the costs associated with related schedule activities.

Owners can track and report on forecasts against schedule over time.

utilities-screen-21 image
Primavera Unifier integrated with ERP

Extend the functionality of your ERP system with purpose-built capital project and portfolio management capabilities.

Integrating Primavera Unifier with your ERP system ensures you can access consistent data with no lag and allows the project team to manage their project forecasts, approvals, and vendor coordination without needing licenses for or entering noncommitted costs in the organization’s financial system.

Mobile application image
Mobile application

Manage and approve business process records from wherever you are, online or offline. Receive notifications, create records, and attach photos from jobsites to keep project progress on track.

utilities-screen-23 image
Oracle Construction Intelligence Cloud

Easily track burn down hours, burn down costs, and schedule compliance.

oil-gas-screen-20 image
Primavera Unifier reports and dashboards

Cut weeks off reporting time with Primavera Unifier.

Custom reports and dashboards are costly and time consuming to develop.

oil-gas-screen-21 image
Oracle Primavera Unifier

Maximize your capital budget by selecting the right oil and gas projects, executing them successfully, optimizing resources across projects, and efficiently operating and maintaining assets to provide reliable service.

Manage retail retrofits and new projects with one cohesive solution


rc118-unifier-essentials-retail-screen-1 image
Primavera Unifier Essentials for retail

Digitize and automate your capital project planning and execution processes to improve efficiency, profitability, operational reliability, and customer service.

Based on Oracle's 20-plus years of capital program management expertise and leveraging industry and customer best practices, Primavera Unifier Essentials includes more than 55 preconfigured, guided business processes to help you prioritize the right projects, deliver them successfully, and maintain them efficiently.

rc118-unifier-essentials-retail-screen-2 image
Portfoliowide planning

Align your new retail facilities and retrofits with your organization's strategic goals by easily accessing up-to-date, relevant project information and using consistent prioritization criteria and processes.

rc118-unifier-essentials-retail-screen-3 image
Use past and current project data

Compare and contrast projects using current and past project data. Choose the projects you want to compare based on your evaluation criteria. Compare similar project types, such as standalone stores, retrofits, and distribution centers, to inform prioritization, selection, and budgeting decisions.

rc118-unifier-essentials-retail-screen-4 image
Visualization supports data-driven decisions

Heat maps provide clear visual representations of your priorities based on your evaluation criteria and let you filter by that criteria.

rc118-unifier-essentials-retail-screen-5 image
Cost planning and cash flow management

Centrally manage, plan, and control costs (including budgets, POs, payments, change management, and bids) across your complete portfolio of regional or global retail projects by leveraging consolidated data and out-of-the-box reports and dashboards.

The cash flow curve is fed by the cost sheet and schedule milestones, providing an accurate view of cash flow over time and across all your projects.

rc118-unifier-essentials-retail-screen-6 image
Manage multiple funding sources

Automate funding allocation and tracking across multiple budgets.

rc118-unifier-essentials-retail-screen-7 image
Connected cost and contract management

Manage commits at the enterprise and project level, including project-level commits against master agreements. Leverage integrations with DocuSign and Adobe Acrobat Sign for digital signatures to keep your projects on track by allowing approvers to sign off no matter where they are.

rc118-unifier-essentials-retail-screen-8 image
Centralized contract and procurement management

Automate bid, contract, change, and payment management in one system.

Assign and track your schedule of values per commitment against cost processes to enforce governance and prevent misallocated costs.

Align budgets to commits to actuals.

Ensure appropriate payment and timing by automating retention management.

Invite vendors to collaborate in the system.

rc118-unifier-essentials-retail-screen-9 image
Change management

Speed up processes and reduce errors with one smooth flow from bid through contract creation, change management, and cost.

Retail customer highlight: Intercorp cuts weeks off reporting time with Primavera Unifier.

rc118-unifier-essentials-retail-screen-10 image
Approval flows: RFIs

Primavera Unifier Essentials has a form-based workflow engine. As an example, once an RFI creation form is completed, the related workflow is automatically generated.

You determine the participants, and Primavera Unifier Essentials records and tracks all actions for easy access, review, and approval, including subsequent reviews, to help keep all your retail projects on track.

rc118-unifier-essentials-retail-screen-11 image
Cross-project risk management

Reduce overall risk by providing your team with access to a central risk register.

Identify more risks and easily track risks from identification and quantification through to action and resolution.

Predictive alerts within Primavera Unifier Essentials give you the information you need to take proactive action before your projects are impacted and release contingency promptly when risk windows close.

rc118-unifier-essentials-retail-screen-12 image
Automatically create punch lists from owner walk-throughs

Primavera Unifier Essentials’ form-based workflow engine develops the punch list from the Owner Walk Through form.

After creation, the Oracle system assigns individual punch list items to the responsible individuals, who are instantaneously notified through Unifier Essentials.

Due dates, inspection readiness, and closeouts are all communicated and tracked in the system, so you can be sure to get your retail facilities operational and open for business on time.

rc118-unifier-essentials-retail-screen-13 image
Advanced reporting—out of the box

Primavera Unifier Essentials includes more than 200 reports and dashboards, each designed based on more than 20 years of successful implementations and built using Oracle Analytics Publisher, the tool used by leading global ERP systems to create reports and dashboards.

Avoid the need to develop custom reports and dashboards, which are costly and time consuming to build.

rc118-unifier-essentials-retail-screen-14 image
Primavera Unifier Essentials for retail

Maximize your capital budget and improve customer experience by selecting the projects that best align with your organization’s goals, executing them efficiently, and optimizing resources across all the projects in your portfolio.

Manage hospitality retrofits and new projects with one cohesive solution


rc118-unifier-essentials-hospitality-1 image
Primavera Unifier Essentials for hospitality

Digitize and automate your capital project planning and execution processes to improve efficiency, profitability, operational reliability, sustainability, and guest service.

Based on Oracle's 20-plus years of capital program management expertise and leveraging industry and customer best practices, Primavera Unifier Essentials includes more than 55 preconfigured, guided business processes to help you prioritize the right hospitality projects, deliver them successfully, and maintain them efficiently.

rc118-unifier-essentials-hospitality-2 image
Portfoliowide planning

Align your new hospitality facilities and retrofits with your organization's strategic goals by easily accessing up-to-date, relevant project information and using consistent prioritization criteria and processes.

rc118-unifier-essentials-hospitality-3 image
Use past and current project data

Compare and contrast projects using current and past project data. Choose the projects you want to compare based on your evaluation criteria. Compare similar project types, such as luxury properties, conference properties, or urban and suburban properties, to inform prioritization, selection, and budgeting decisions.

rc118-unifier-essentials-hospitality-4 image
Visualization supports data-driven decisions

Heat maps provide clear visual representations of your priorities based on your evaluation criteria and let you filter by that criteria.

rc118-unifier-essentials-hospitality-5 image
Cost planning and cash flow management

Centrally manage, plan, and control costs (including budgets, POs, payments, change management, and bids) across your complete portfolio of hospitality projects by leveraging consolidated data and out-of-the-box reports and dashboards.

The cash flow curve is fed by the cost sheet and schedule milestones, providing an accurate view of cash flow over time and across all your projects.

rc118-unifier-essentials-hospitality-6 image
Manage multiple funding sources

Automate funding allocation and tracking across multiple budget line items.

rc118-unifier-essentials-hospitality-7 image
Connected cost and contract management

Manage commits at the enterprise and project level, including project-level commits against master agreements. Leverage integrations with DocuSign and Adobe Acrobat Sign for digital signatures to keep your projects on track by enabling approvers to sign off from any location.

rc118-unifier-essentials-hospitality-8 image
Centralized contract and procurement management

Automate bid, contract, change, and payment management in one system.

Assign and track your schedule of values per commitment against cost processes to enforce governance and prevent misallocated costs.

Align budgets to commits to actuals.

Ensure appropriate payment and timing by automating retention management.

Invite vendors to collaborate in the system.

rc118-unifier-essentials-hospitality-9 image
Change management

Speed up processes and reduce errors with one smooth flow from bid through contract creation, change management, and cost.

rc118-unifier-essentials-retail-screen-10 image
Approval flows: RFIs

Primavera Unifier Essentials has a form-based workflow engine. As an example, once an RFI creation form is completed, the related workflow is automatically generated.

You determine the participants, and Primavera Unifier Essentials records and tracks all actions for easy access, review, and approval, including subsequent reviews, to help keep all your retail projects on track.

rc118-unifier-essentials-hospitality-11 image
Cross-project risk management

Reduce overall risk by providing team members with access to a central risk register.

Identify more risks and easily track risks from identification and quantification through to action and resolution.

Predictive alerts within Primavera Unifier Essentials give you the information you need to take proactive action before your projects are impacted and release contingency promptly when risk windows close.

rc118-unifier-essentials-retail-screen-12 image
Automatically create punch lists from owner walk-throughs

Primavera Unifier Essentials’ form-based workflow engine automatically develops the punch list from the Owner Walk Through form.

After creation, the Oracle system assigns individual punch list items to the responsible individuals, who are instantaneously notified through Unifier Essentials.

Due dates, inspection readiness, and closeouts are all communicated and tracked in the system, so you can be sure to get your hotels and conference facilities operational and open for critical conference and event seasons on time.

rc118-unifier-essentials-hospitality-13 image
Advanced reporting—out of the box

Primavera Unifier Essentials includes more than 200 reports and dashboards, each designed based on more than 20 years of successful implementations and built using Oracle Analytics Publisher, the tool used by leading global ERP systems to create reports and dashboards.

Eliminate the need for custom reports and dashboards, which are costly and time consuming to develop.

rc118-unifier-essentials-retail-screen-14 image
Primavera Unifier Essentials for hospitality

Maximize your capital budget and improve the guest experience by selecting the projects that best align with your organization’s goals, executing them efficiently, and optimizing resources across all the projects in your regional or global portfolio.

Learn more about capital program management and project controls for all your hospitality projects.

Help ensure crews can work constraint-free using Advanced Work Packaging


Primavera Unifier Advanced Work Packaging configuration image
Primavera Unifier Advanced Work Packaging configuration

The Oracle Primavera Unifier Advanced Work Packaging (AWP) configuration supports the Construction Industry Institute (CII) AWP data definition SR19. The AWP configuration helps you increase productivity, prevent project delays, and keep schedules on track. Built on the Unifier Accelerator base, the AWP configuration helps prevent obstacles for crews on projects by packaging all aspects of work together to automate constraint management and approval cycles.

Primavera Unifier Advanced Work Packaging configuration image
Primavera Unifier Advanced Work Packaging configuration

The AWP configuration supports implementation of integrations with Primavera P6 EPPM, ERP systems, visualization solutions, and analytics.

Primavera Unifier’s advanced RESTful APIs support middleware solutions, including Oracle Integration Cloud, Oracle Consulting’s Platform Integration Framework (PIF), and your existing middleware solutions.

AWP based capital project delivery Primavera P6 schedule image
Work package structure and modifications

Oracle Construction and Engineering’s AWP configuration provides a consistent and structured approach to packaging work with the construction sequence, driving both engineering and procurement work by discipline. Any modifications to a work package are automatically captured and become part of the audit trail, so details such as which constraint was cleared and what may have been reconstrained are clearly communicated and become part of the project record.

Procurement work package image
Procurement work package

Integrated processes, systems, and data are key to Oracle Construction and Engineering’s AWP configuration. Project stakeholders and AWP practitioners can manage and track material requisitions, purchase order line items, and supplier information by integrating the system of record, generally the ERP system. The procurement work package consolidates relevant information from the engineering work package (EWP), construction work package (CWP), and construction work area. When integrated, the Oracle AWP solution supports seamless data flow to minimize errors, rework, and administrative overhead.

construction work package image
Construction work package

The Oracle AWP configuration provides visibility into the package scope and schedule. AWP practitioners can see the relationships between scopes of work packages that contribute to a construction work package from a single view without having to move between screens or systems. Additionally, work packages follow a predefined, guided workflow process to ensure that constraints are identified and resolved prior to the workflow proceeding.

Engineering work package image
Engineering work package

When the systems are integrated, relationship management is automated in terms of documentation, status and access, drawings, and specifications that support the scope of work within the context of the engineering work package (EWP). The EWP digitally informs the status of engineering readiness to the CWP, as well as the Primavera P6 schedule, so that project managers can transparently see what work has been completed thus far and how much work is remaining.

Installation work package image
Installation work package

Relationships between installation work packages (IWPs) and construction work packages (CWPs) are managed, along with constraints associated with the IWP, through a system-generated audit log coupled with a workflow engine. All information needed to complete the scope of the IWP is organized within a single view. For the workface planner, the IWP is designed to be integrated with the 3D model so that IWP planning can be performed directly from the 3D user interface. The IWP also includes integrated data from the Primavera P6 schedule so that progress and status of the IWP can be reflected in the project schedule.

rc118-primavera-awp-screen-7 image
Work package structure and modifications

Automated constraint management ensures that no installation work packages (IWPs) are released for execution prematurely. Workface planners can see all constraints that are relevant to each work package and understand the deficiencies so they can address them.

Installation Work Packages image
Constraint management

Automated constraint management ensures that no Installation Work Packages are released for execution prematurely. WorkFace planners can see all constraints that are relevant to each work package and understand the deficiencies in order to address them.

work package execution image
Approval cycles

Automated workflows help ensure that work package requirements are reviewed and approved by the necessary parties prior to their release. Automated communication among the WorkFace planners, project managers, vendors, and service providers facilitates informed, collaborative decision-making.

rc118-primavera-awp-screen-10 image
Package delivery

The Advanced Work Package management solution helps ensure that constraint-free packages of work are available to the crafts to install, ensuring smooth startup to deliver packages and projects on schedule. All constraints are listed with detail and status.

awp-screen image
Model visualization

Visualization enhances collaboration and optimizes your entire asset lifecycle. The Oracle AWP configuration visualizes tags and their corresponding data, such as procurement/installation status, via our partner, CAXperts’, UniversalPlantViewer (UPV) application . This tool provides a model of the asset, the construction work area (CWA) of that asset, and the detail of all underlying work packages. Other 3D visualization solutions could be introduced if required.

installation work package image
UniversalPlantViewer

The UniversalPlantViewer (UPV) enhances collaboration and helps you optimize your entire plant lifecycle.

Integration between the Advanced Work Packaging solution and UPV visualization tool provides a model of the asset, the construction work area of that asset, and the detail of each Installation Work Package within that construction work area.

 image
Package readiness assessment

The clear and complete checklist within the Installation Work Package form helps ensure the IWP is ready and no constraints remain.

awp-screen image
Prioritize high-impact work packages

The native integration between the Primavera P6 scheduling solution and Primavera Unifier enable a continuous tie to the project schedule to support work package prioritization based on the project schedule.

awp-screen image
Visibility and audit trail

All relevant parties have access to the up-to-date accurate information they need to help ensure a constraint-free project.

awp-screen image
Oracle Primavera Unifier—Advanced Work Package solution

Keep your projects on track by helping to ensure your crews can work constraint free.

4 benefits of connected cost and schedule management with Primavera.

Get started with program management and project controls